Keystone Roofing & Driveways
    07498 530569Get a Free Quote
    Completed new roof installation by Keystone Roofing in Stoke-on-Trent

    Real Projects, Real ResultsAcross Staffordshire & Cheshire

    Every project below was completed by our own team, with real photographs, specified materials, and written guarantees. No stock photos — just honest work.

    Completed new roof with dark slate tiles and gable detail on a Victorian terrace in BurslemNew slate roof ridge tiles with mechanical fixings on a completed Keystone re-roofRoof battens and breathable membrane being installed during a full re-roof in Stoke-on-Trent

    Full Roof Replacement — Victorian Terrace, Burslem

    Complete strip-and-relay on a 3-bed Victorian terrace with original Staffordshire blue clay tiles. The existing roof had widespread nail sickness causing multiple slipping slates and persistent leaks in the rear bedroom.

    Scope of Work

    Full scaffold erection, strip existing tiles and battens, replace degraded felt underlay with breathable membrane, re-batten and re-tile with matching Staffordshire blue clay tiles, new lead flashing to chimney and abutments, ridge tiles re-bedded with dry-fix system.

    Result

    Completed in 5 working days. Zero leaks since completion 14 months ago. 20-year workmanship guarantee issued.

    Learn about new roofs
    Storm-damaged roof showing exposed rafters and tiles being replaced during emergency repairCompleted roof repair with new ridge tiles on a residential property

    Emergency Storm Repair — Semi-Detached, Tytherington

    Storm damage displaced 8 ridge tiles and tore lead flashing from the chimney abutment, allowing water directly into the roof space. Interior ceiling damage was already visible.

    Scope of Work

    Same-day temporary weatherproofing, followed by permanent ridge tile re-bedding with mechanical fixings, chimney flashing replaced with Code 4 lead sheet, damaged roof tiles replaced.

    Result

    Temporary fix within 3 hours of call. Permanent repair completed within 5 days. 10-year guarantee on all work.

    Learn about roof repairs
    Old flat roof membrane being stripped back to reveal OSB deck during replacementNew OSB3 deck boards fitted ready for flat roof membrane installationCompleted EPDM rubber flat roof membrane installed on a kitchen extension

    GRP Flat Roof — Kitchen Extension, Sandbach

    Replacement of a 15-year-old felt flat roof on a rear kitchen extension. The original felt had multiple blisters and a persistent slow leak above the kitchen units.

    Scope of Work

    Strip existing felt and insulation, install 80mm Celotex insulation board, Topseal GRP fibreglass system with manufacturer warranty, new aluminium edge trim, EPDM-sealed upstand to house wall.

    Result

    Completed in 2 working days. Improved thermal performance reduced kitchen condensation. Manufacturer guarantee plus our 10-year workmanship guarantee.

    Learn about flat roofs
    Bungalow re-roof in progress with workers laying new tiles in a Staffordshire neighbourhoodClose-up of completed slate roof with dry-fix ridge system and hip junctionCompleted new interlocking roof tiles with hip ridge detail

    Bungalow Re-Roof — Semi-Detached, Clayton

    Complete re-roof of a 1960s semi-detached bungalow with original concrete tiles that were porous and deteriorating. Persistent damp patches in the bedroom ceilings.

    Scope of Work

    Full scaffold, strip original concrete tiles, inspect and repair battens, install breathable roofing membrane, re-batten to current standards, new interlocking slate tiles, dry-fix ridge system throughout.

    Result

    Completed in 4 working days. Damp patches eliminated immediately. 20-year workmanship guarantee issued.

    Learn about new roofs
    Flat roof junction between pitched tiles and new membrane during EPDM installation

    Flat Roof Overlay — Dormer Extension, Newcastle-under-Lyme

    EPDM overlay on a failing felt flat roof covering a dormer extension. Water was pooling due to incorrect falls in the original installation.

    Scope of Work

    Strip old felt, correct falls with tapered firring pieces, install new OSB3 deck, bond single-piece EPDM rubber membrane, install new drip edge trim and upstand details.

    Result

    Completed in 2 days. No ponding, no leaks. 20-year manufacturer-backed guarantee on the EPDM system.

    Learn about flat roofs
    Professional roofing work by Keystone Roofing and Driveways

    Your Project Could Be Next

    Tell us what you need and we'll provide a free inspection and fixed-price quote — no obligation.

    Call NowFree Quote